Remove Building Controls Remove Electrical Systems Remove Fire Protection Systems Remove HVAC Systems
article thumbnail

Armstrong Aids Expansion of Deep Lake Water Cooling System

CCR Magazine

Armstrong Fluid Technology recently participated in the expansion of the Enwave Energy Corporation Deep Lake Water Cooling (DLWC) system that provides clean energy services to buildings in downtown Toronto via an innovative district cooling network. Armstrong supplied six 600hp Design Envelope pumps to the project,” Scarafile added.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Upgrading Electrical Infrastructure In Commercial Buildings

CCR Magazine

A commercial building’s electrical system is its lifeblood. Strategic planning is crucial for smoothly renovating commercial electrical infrastructure. This article dives into the vital strategies for upgrading electrical infrastructure in commercial buildings. Electrical engineers are invaluable here.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). The post KDOT Blaine Subarea Modernization & Storage Building appeared first on MCP GROUP.

article thumbnail

KDOT Beloit Subarea Modernization

The MCP Group

Bid Due Date | February 8, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space. 2021 Addenda None at this time.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021