article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

Armstrong’s Fire Manager Boosts Intelligent Pumps

CCR Magazine

Armstrong Fluid Technology has announced the launch of Fire Manager, a cloud-based service that enables Active Performance Management in its industry-leading Design Envelope Fire Pumps. In the shift toward digitalization and integration of fluid-flow systems, Armstrong leads the industry.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Exterior cavity fireblocking: Exceeding fire performance

Construction Specifier

and Steven Gaynor, MBA Photo courtesy Tenmat New York City recently became the first jurisdiction in the country to reject and rewrite major sections of the International Building Code’s ( IBC ’s) language around fire protection in exterior facades. For decades, buildings have relied on intumescent materials for fire control.

article thumbnail

Playing with Fabric

Civil + Structural Engineer

By Shannon Humbert, Legacy Building Solutions Rigid-frame fabric buildings offer a permanent solution for athletic facilities. For many entities, both public and private, the need for an athletics and recreation facility comes down to two options: A permanent brick and mortar building, or a lower-cost fabric bubble.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). The post KDOT Blaine Subarea Modernization & Storage Building appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021