Remove Building Controls Remove Fire Protection Systems Remove HVAC Systems Remove Masonry
article thumbnail

Integrated Facility Services Completes Kingston K-14 Addition

CCR Magazine

Integrated Facility Services (IFS) served as the mechanical and building controls contractor for the project, overseeing the design, equipment procurement and installation for the comprehensive HVAC project. It is reassuring to have IFS at the helm in installing our HVAC system.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). The post KDOT Blaine Subarea Modernization & Storage Building appeared first on MCP GROUP.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

KDOT Beloit Subarea Modernization

The MCP Group

Bid Due Date | February 8, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space. 2021 Addenda None at this time.