Remove Building Controls Remove Fire Protection Systems Remove HVAC Systems Remove Plumbing
article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Armstrong’s Fire Manager Boosts Intelligent Pumps

CCR Magazine

Armstrong Fluid Technology has announced the launch of Fire Manager, a cloud-based service that enables Active Performance Management in its industry-leading Design Envelope Fire Pumps. In the shift toward digitalization and integration of fluid-flow systems, Armstrong leads the industry.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). The post KDOT Blaine Subarea Modernization & Storage Building appeared first on MCP GROUP.

article thumbnail

KDOT Beloit Subarea Modernization

The MCP Group

Bid Due Date | February 8, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space. 2021 Addenda None at this time.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021

article thumbnail

KSU Animal Science Arena

The MCP Group

Bid Due Date | March 7, 2024 2:00 PM Project Description The project consists of a new 79,507 sf PEMB arena with heavy timber framing, structural steel and associated sitework. 2021 Addenda ADD 1 The post KSU Animal Science Arena appeared first on MCP GROUP.