COWI reaches major milestone on McKinley Bridge
Civil + Structural Engineer
OCTOBER 18, 2024
The bridge was moved with self propelled modular transporters (SPMTs) from the staging yard to its final position and crossed Sampson Avenue, the Arlington Flood Control Channel, and two BNSF mainline tracks. The project will build an arch bridge to elevate McKinley Street over the BNSF railroad tracks and Arlington Channel.
Let's personalize your content