Remove Building Design Remove Handover Remove Schedule Management
article thumbnail

When Speed Counts: EPCM Delivery for Industrial and Manufacturing Projects

Civil + Structural Engineer

Owners building complex industrial projects face a wide range of risks in delivering their projects as quickly and as cost-effectively as possible. For owners facing this scenario, integrated services like the Engineering, Procurement, and Construction Management (EPCM) delivery method may be the best option for your project.

article thumbnail

Safety in Design Manuals: The Missing Piece in Project Handover

OmTrak

Safety in Design is a pressing concern in today’s construction and infrastructure landscape, with experts and seminars offering a wealth of advice. However, when it comes to project handover, it seems that the Safety in Design process is conspicuously absent. Further investigation uncovered an interesting aspect.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

Trending Sources

article thumbnail

The 3 Core Pillars for Redefining Construction Handover 

Autodesk Construction Cloud

Handover is often thought of as happening only at the end of a project. But project handover really spans the lifecycle of a project as it involves multiple stakeholders, processes, and activities within that lifecycle. For that reason, it’s critical to get handover right from the very beginning.

article thumbnail

Brett Hulyer Leads WebFM’s Strategic Expansion in the Middle East

OmTrak

WebFM Paves the Way for Construction Innovation in the Middle East with OmTrak We are pleased to announce a significant milestone for WebFM, a leading provider of the construction project management software OmTrak, as we expand our footprint into the Middle East.

article thumbnail

Best Practices for Project Scheduling and Time Management in Construction

CCR Magazine

Time management and proper scheduling are essential for construction projects to be completed within set time and budget frames. In this article, the author seeks to address some of the key measures and standards that should be adopted by construction managers and contractors to enhance scheduling.

article thumbnail

Why Owners Need a Common Data Environment

Autodesk Construction Cloud

Beyond that, the cost of building facilities is increasing. But, design and construction costs only account for about 10-20% of a building’s total lifecycle cost. But today, many owners lack visibility into the construction of their buildings. Acquiring capital is getting more expensive with rising interest rates.

article thumbnail

What is preconstruction and why it’s important

LetsBuild

As a project manager, you have to attend to every step of the construction process, from design to handover. A single design flaw, drafting mistake, or other oversight can result in significant cost and schedule overruns. Having a predetermined schedule significantly reduces the likelihood of preventable delays.