Integrated Project Delivery – IPD, Job Order Contracting – JOC, BIM, and Efficient Project Delivery

Building Information Management

Project delivery methods set the tone and largely dictate the relative success of any facility construction, renovation, repair, or sustainability project. Project delivery methods must therefore be a component of BIM, a fact many/most 3D visualization software vendors appear to have ignored. So what is IPD?

article thumbnail

Construction Classification Criticality – A Draft White Paper

Job Order Contracting

Building classification systems are critical if any measurable productivity gains are to be achieved across the Architecture, Engineering, Construction, Operations, and Owner (AECOO) domains and associated life-cycle management of the built environment. Construction Classification Criticality.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The “BIM Vendor” Problem? New Graphisoft-Archicad White Paper

Building Information Management

Both of these folks appear to have taken the approach to market BIM primarily to architects and as a 3D design tool. By visualization, I mean the the ability to “view” building life-cycle data… buildings, systems, subsystems, line items, components, costs, conditions, vs. time and vs. various what-if scenarios.

article thumbnail

Collaborative Construction Solution

Job Order Contracting

A collaborative construction solution, capable of consistently delivering quality repair, renovation, and new builds, on-time and on-budget, is available to any real property owner. “project” in reality is simply a bunch of diverse sub-projects, each handled independently and in its own manner. The Problem.

article thumbnail

Job Order Contracting Information

Job Order Contracting

Public works contracts vary from private sector contracts in that legislation sets the contracting guidelines for contracts and the public interest demands safeguarding process integrity. Also referred to as the “Design-Bid-Build” process, this system has long been the most prevalent option for large and small public works contracts.

article thumbnail

The Role Owner’s Play in Building Construction, Repair, Renovation …

Building Information Management

Owners determine the approach for funding, using, sustaining and disposing of buildings and infrastructure. They also select the construction delivery method. A team member that is involved throughout the program/project. Contact me for the white paper).

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Integrating operating, design and construction knowledge through broad based team meetings. Building Information Modelling BIM in the Construction Industry – Technical Report TR-1405. should not be considered LEAN efficient construction delivery methods. Alignment of risk and reward with a party’s ability to control risk.