Remove Building Information Modeling (BIM) Remove Document Remove Schedule Management
article thumbnail

New Autodesk Construction Cloud features help teams make early, more sustainable decisions

Civil + Structural Engineer

These new capabilities will provide holistic and tactical support to help teams prioritize tasks, assess tradeoffs, build on intuition, and validate assumptions so choices made are more informed. The Correspondence tool is incredibly positive,” said Chris Rossetto, VDC Manager at Hansen Yuncken. “It

article thumbnail

Collaborate Like Never Before:

Civil + Structural Engineer

3 Uses for Newforma Konekt’s 2D/3D Viewer to Save Time and Reduce Re-Work Nikita Lambert, Product Owner From hypermodeling to action item and issue localization, engineering teams can prevent re-work and collaborate easily with the right project information platform. This lets you see your project information clearly from any angle.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

BIM 2015 Reader Survey - Standard Form Documents, Execution Plans and COBie - What's Your Experience?

Construction Dive

Have you encountered or used building information modeling (BIM) on any of your projects? Are you interested in BIM but don''t know where to begin? BIM seems to highly regarded by those who have made the transition. Owners cite facility management benefits in addition to lower costs.

article thumbnail

Tekla 2024 Structural BIM Software Offers Enhanced User Experience and Connects Workflows Across Projects and Stakeholders

Civil + Structural Engineer

Enhancements and Further Open Standards Adoption Boost Collaboration Performance WESTMINSTER, Colo. — Trimble (NASDAQ: TRMB) announced today the introduction of 2024 versions of its Tekla ® software for constructible Building Information Modeling (BIM), structural engineering and steel fabrication management.

article thumbnail

Better Manage Construction Costs Schedules and Quality

Job Order Contracting

Sixty (60%) percent of all project fail to meet both cost and and schedule targets. Fortunately there are proven processes to better manage construction costs, schedules, and quality. Reasons for Poor Repair, Renovation, Maintenance, and New Build Outcomes. Better Manage Construction Costs.

article thumbnail

Over 275 Partners Now Integrate with Autodesk Construction Applications 

Autodesk Construction Cloud

Connecting technologies and information is crucial for construction firms to transition from data novices to data leaders. Each one of these partners recognizes that linking data with Autodesk solutions helps teams advance their data capabilities and ultimately build better.

article thumbnail

How Much is Poor Construction Document Management Costing You? 

Autodesk Construction Cloud

In the last 20 years, the number of buildings in the world that are at least 200 meters tall has increased by nearly 500%. As teams get larger and construction projects become more complex, proper document management needs to be an integral part of your workflow. billion in rework alone annually.