Remove Building Information Modeling (BIM) Remove Integrated Project Delivery (IPD) Remove Renewable Energy Systems
article thumbnail

” Evidence-based ” Life-cycle Federal Facility Management, BIM, and the Status Quo – NIBS, FFC

Building Information Management

Requirements for facility life-cycle management, efficient repair/maintenance/sustainability, BIM. Physical and Functional Condition of Assets (Portfolio, Site, Building/Area, System, Sub-system, Component Levels). Maintenance management systems. Buildings are a collection of components grouped into systems.

article thumbnail

7 Trends Shaping the Future of the Construction Industry

CCR Magazine

Sustainable Building In today’s contemporary building industry, sustainability has emerged as an essential component. ” Sustainable construction seeks to reduce the adverse effects on the environment while simultaneously improving the comfort and well-being of the people who live in the building.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Autodesk Construction Champions 2023: 25 People Powering the Future of Construction 

Autodesk Construction Cloud

For one, it’s an opportunity to build a physical legacy. From design and VDC professionals to business and project managers, these construction leaders aren't just building structures and facilities—they're shaping our world. Many things make construction an exceptional field to work in.

article thumbnail

Facilities Operations & Maintenance Management

Job Order Contracting

LEAN Business Models and Methods. Facilities Operations & Maintenance Management requires and appropriate and ongoing consideration of PEOPLE, PROCESS, INFORMATION, and TECHNOLOGY is needed during the development of the Operations Manual / Execution Plan. LEAN Business Models and Methods. Budgeting/Capital Planning.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

In short, project teams, including owners, better deliver structures according to their capabilities, requirements, timelines, and budgets. In short, project teams, including owners, better deliver structures according to their capabilities, requirements, timelines, and budgets. 00 01 01 Project Title Page. Traffic Information.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

In short, project teams, including owners, better deliver structures to according to their capabilities, requirements, timelines, and budgets. In short, project teams, including owners, better deliver structures to according to their capabilities, requirements, timelines, and budgets. 00 01 01 Project Title Page. Requirements.