Construction Classification Criticality – A Draft White Paper

Job Order Contracting

Building classification systems are critical if any measurable productivity gains are to be achieved across the Architecture, Engineering, Construction, Operations, and Owner (AECOO) domains and associated life-cycle management of the built environment. Construction Classification Criticality.

article thumbnail

Job Order Contracting Information

Job Order Contracting

Job order contracting information is key to improving construction productivity. Public works contracts vary from private sector contracts in that legislation sets the contracting guidelines for contracts and the public interest demands safeguarding process integrity. public contracts.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

LEAN Job Order Contracting Intro 4

Job Order Contracting

Creating an open information environment. Integrating operating, design and construction knowledge through broad based team meetings. ASSET LIFE-CYCLE MODEL – Total Cost of Ownership Management – A framework for facilities life-cycle management. should not be considered LEAN efficient construction delivery methods.

article thumbnail

Define Construction Procurement

Job Order Contracting

While Federal, State, County, and Local Governments as well as other public entities may have volumes of regulations regarding construction procurement practices, in many cases they are outdated and do not include current LEAN construction procurement/delivery best management practices. Define Construction Procurement.

article thumbnail

Collaboration, Transparency, Accuracy, Process, and supporting Technology – The Keys to Improved Productivity for Building Construction, Renovation, Repair, and Sustainability

Building Information Management

How can multiple cost estimators share information on a project, or communicate with Owners, Contractors, AE’s, Subs, etc… if they aren’t speaking the same language? The AECOO sector can’t even begin a discussion about achieving higher levels of interoperability, exchanging BIM models and data, etc.,

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Managing pandemic disruptions and getting projects over the finish line has required a well-tempered balance of leadership, creativity, and innovation to solve incredibly challenging problems. One of the greatest things about AEC is how many talented people contribute to a single project. Justin Maryak , Auld & White Constructors.