Remove Building Performance Measurement Remove Closeout Remove Estimating
article thumbnail

100+ Construction Industry Statistics

Autodesk Construction Cloud

Construction industry statistics and data are playing an increasingly important role in the building sector. From measuring bid-to-win ratio, to how much a project is over budget or schedule, and KPIs , the more numbers you can put behind your work, the better. The Rise of New Building Methods. Industry Performance.

article thumbnail

An Introduction to Job Order Contracting

Job Order Contracting

JOC Programs are competitively procured, performance-based, and supports long-term owner-contractor relationships. JOC’s history begins with the US Army in Europe in the 1980’s. Components of the OpenJOC UPB Estimate – Determine quantities of work • Build the estimate from UPB • Summarize the estimate and apply coefficient.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

12 Essential Construction Process Management Steps that Project Managers Should Follow

Jonas Construction

They have timelines that are measured in years, and this leaves much room for error. During the planning stage, start by identifying all required construction activities, then move ahead and build the construction schedule, and finally, move on to devising your team structure. Enter process management.

article thumbnail

What are Simplified Acquisition of Base Engineer Requirements (SABER)

Building Information Management

Simplified Acquisition of Base Engineer Requirements (SABER) contracts provide a streamlined means to complete construction projects estimated at less than 750K. UPGs list tasks by unit of measure and unit price. Estimating the expected scope of the installation SABER Program. Source – AFFARS IG5336.9201-ch3-A.

article thumbnail

Buyer’s Guide to Evaluating and Selecting Construction Project Management Software

In Eight

This real-time field data flow allows project managers to track progress against plans and then connect that data with the front office to manage performance and risks. By connecting these systems, everyone involved in the project has the performance visibility needed to take real-time corrective actions and keep projects on track.

article thumbnail

Ten Warning Signs A Project Is In Trouble and What To Do About It

DRB Development Solutions

Cash flow — the two words that drive a contractor to perform. At the outset of a project, the contractor prepares a schedule of values from which his progress payments are measured. Several comments regarding the schedule of values: Compare the schedule with the estimator’s budget for the Project.

article thumbnail

Top 30 Construction Classes at Autodesk University 2021

Autodesk Construction Cloud

Sustainable building. Massive amounts of data are created from project inception to design, planning, building, closeout, operations and beyond. We’ll walk through hh2’s integration between Sage CRE 300 and Autodesk Build as well as Quickbooks Online, which integrates with Autodesk Build using ACC Connect.