article thumbnail

9 Types of Curing | What Is Curing of Concrete | Why Curing Is Important | Minimum Curing Period for Concrete Cement | How Long Does It Take for Concrete to Dry

CivilJungle

What Is Curing of Concrete? Curing performs a crucial role in the growth as well as the resilience of concrete strengths. Such an approach is termed the curing of concrete. Why Curing Is Important? Method for the Cure of the Concrete: The draining water mostly on the concrete surface is used to cure the concrete.

Curing 52
article thumbnail

2023 Yearbook of Engineering Achievement: Transportation & Infrastructure

Civil + Structural Engineer

The project leveraged four alternative delivery methods including: landside and airside construction management at-risk, a design-build-operate-maintain baggage team, design-bid-build award contracts and multiple design-build concession/tenant packages.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

#144:  What Is a “Material” Breach Justifying Contract Termination?

NH Construction Law

When an owner hires a contractor to perform work, there is an expectation that the contractor will adhere to the express and implied contract terms, the ultimate goal being to build what the contract calls for in a proper, safe and timely manner, free of claims from injured third parties or unpaid suppliers and subcontractors.

article thumbnail

Vibration isolation for Norfolk House development 

Civil + Structural Engineer

Now, it has been converted into a new eight-story commercial office building. However, given the building’s proximity to the London Underground and HS2, vibration control was required for the newly excavated basement level. Originally built in the 1930s, Norfolk House is a Neo-Georgian red brick building, located in St James’s Square.

article thumbnail

Preventing flooring failures: Factors to consider in substrate prep

Construction Specifier

Certified installers, especially those who carry substrate prep certification, are trained to assess and correct moisture and pH issues, so flooring projects start on the right foot, and help protect the integrity of the floor’s performance and design. After 60 seconds, plus or minus five seconds, measure pH using a strip.

article thumbnail

ASTM F710: Preparing the Concrete Floor

GCP Applied Technologies

Cutting corners on this critical step can lead to problems down the road that negatively impact the floor’s performance and shorten its lifespan. If using the probe test method for measuring moisture vapor emission rate (MVER) outlined in ASTM 2170, the maximum limit specified by ASTM F710 is 75% relative humidity (RH). VERSASHIELD.

article thumbnail

Construction Law March 2025

Construction Law

Editors comment New Act no cure for procurement malaise Editor Nick Barrett asks whether the long awaited Procurement Act which came into force in February is likely to result in the improvement that the UKs public sector procurement needs.