Remove Building Performance Measurement Remove Integrated Project Delivery (IPD) Remove Risk Management Remove White Paper
article thumbnail

Job Order Contracting – Lean Construction History

Job Order Contracting

The LEAN Integrated Construction Project Delivery Method. . Traditional design-bid-build (DBB) construction delivery was too inefficient for the large numbers of renovation, repair, and sustainment/maintenance projects. Associated delays were negatively impacting the Army’s mission.

article thumbnail

Unlock Public Sector Construction Productivity – A White Paper

Job Order Contracting

Unlock Public Sector Construction Productivity[1] with Proven Strategies: A White Paper. It has done virtually nothing to measurably impact the repair, renovation, maintenance, and construction of the built environment. The risk of change is high, however, not pursuing fundamental change is potentially catastrophic.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Rewiring the Construction Sector with the OpenJOC(TM) LEAN Delivery Method

Job Order Contracting

The construction delivery method and its associated contractual framework affects the outcome of any repair, renovation, or new construction project more than any other single element. Similarly technology vendors have marketing their solutions as opposed to integrated proven LEAN process within technology.

article thumbnail

40 Under 40: Champions of Construction 2021

Autodesk Construction Cloud

Managing pandemic disruptions and getting projects over the finish line has required a well-tempered balance of leadership, creativity, and innovation to solve incredibly challenging problems. One of the greatest things about AEC is how many talented people contribute to a single project. Senior BIM Manager. Nima Jafari.