Remove Building Products Distribution Remove Ceiling Systems Remove HVAC System Installation Remove Piping Installation
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

Importance of Construction Terminology Building terms and unique collocations are like the secret sauce that makes communication in the industry smooth and efficient. Better productivity and efficiency, satisfied clients, and shorter project timelines – everything making construction successful. No more confused faces or mix-ups.

article thumbnail

What Is Mezzanine Floor | Types of Mezzanine Floor Construction | Features of Mezzanine Floors | Advantages & Disadvantages of Mezzanine Floors | Uses of Mezzanine Floors | Application of Mezzanine Floors

CivilJungle

The mezzanine floor is an intermediate floor of a building , below the open floor. At least twice as high as a floor with minimum height on a ceiling the mezzanine floor is placed halfway up the wall on a floor. To determining maximum floor space, a mezzanine does not count as one of the floors in the building.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Open information exchange of Heating, Ventilating and Cooling systems (HVAC) – A Important Standard? – HVAC information exchange – HVACie

Building Information Management

Open information exchange of Heating, Ventilating and Cooling systems (HVACie), released by the Engineer Research and Development Center for public review. HVACie extends the existing Industry Foundation Class Coordination View including equipment and system information streamlining construction shop drawing and fabrication.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Clean scale from head(s) after removing and install cover plate. Check and clean fill tube, remove spacer pipe and cap fill tube. Remove fill tube cap, install spacer pipe and install fill tube. Clean motor and assembly.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 41 53 Bid Form – Design/Build (Single-Prime Contract). Requirements.