Remove Building Resilience Remove Ceiling Systems Remove HVAC Systems
article thumbnail

The Desert Comfort Idea Home: a True Desert Oasis

The Pro Builder

The project is the brainchild—and now the personal home—of Mark LaLiberte , a renowned building science expert and co-founder and president of Construction Instruction , a consultancy and training facility based in Denver. There is a very limited labor force, especially when you’re doing something really state-of-the-art,” Leavitt says.

article thumbnail

Why I Chose a Tiny Container Home Over a Tiny House (Real Costs Revealed)

UK Construction Blog

Their resilient construction and the ability to stack up to six units high made them the perfect choice for my alternative housing trip. This made me look for different ways to build a home. These include energy-saving windows and systems to save water. The best part is that container homes take less time to build.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

Aligned with Alexandrias Green Building Policy, ACHS Minnie Howard Campus is targeting Net-Zero Energy and LEED Gold Certification through the U.S. Green Building Council. Meeting Perkins Eastmans project selection criteria, Rockfon ceiling systems help optimize sound absorption, enhance daylighting and support indoor air quality.

article thumbnail

2023 BALA Winners: The Best of the Best

The Pro Builder

Floor-to-ceiling glass at the entry and along the length of the back façade blur the line between interior and exterior and frame views of the courtyard water feature at the front and the deck and landscaped yard at the back. It also was designed to take advantage of a community solar program.

article thumbnail

Energy-saving strategies: Ceiling panels with phase change material (PCM)

Construction Specifier

Aging HVAC equipment: Many facilities, particularly K-12 schools, are struggling with outdated equipment that operates inefficiently. The recent innovation of integrating phase change material (PCM), a well-established technology, into ceiling panels has generated significant interest.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.