Remove Building Resilience Remove Fire Protection Systems Remove Masonry Remove Plumbing Systems
article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work. 2021 Addenda ADD 1 The post KDOT Gardner Subarea Complex appeared first on MCP GROUP.

article thumbnail

KDOT Blaine Subarea Modernization & Storage Building

The MCP Group

Bid Due Date | January 25, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space, and a new 5,925 sf pre- engineered wood building (pole barn). The post KDOT Blaine Subarea Modernization & Storage Building appeared first on MCP GROUP.

article thumbnail

KDOT Beloit Subarea Modernization

The MCP Group

Bid Due Date | February 8, 2024 2:00 PM Project Description The project consists of a new 7,000 sf pre-engineered metal building with office and shop space. 2021 Addenda None at this time.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)