Remove Building Resilience Remove Fire Protection Systems Remove Waterproofing Systems
article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework. 2021 Addenda ADD 1 ADD 2 The post KSU Agronomy Research & Innovation Center appeared first on MCP GROUP.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Bid Due Date | May 16, 2024 2:00 PM Project Description The project consists of a new 34,551 sf three-story, steel framed building with associated sitework. 2021 Addenda ADD 1 The post ESU Nursing & Student Wellness Center appeared first on MCP GROUP.

article thumbnail

Seward County CC CDL Truck Driving School

The MCP Group

Location Liberal, Kansas Plans 22-051 SCCC CDL Truck Driving School – Bid Set Specifications 22-051 SCCC Specifications General Information Bid Invitation Seward CCC CDL Truck Driving School MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

KSU Animal Science Arena

The MCP Group

Location Manhattan, Kansas Plans KSU Animal Science Arena Combined Plans Volume 1 KSU Animal Science Arena Combined Plans Volume 2 Specifications 014722 Specification Vol 1 014722 Specification Vol 2 General Information Bid Invitation KSU Animal Science Arena MCP Supplemental Conditions.2021

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Berkley Beer Garden

The MCP Group

Bid Due Date | October 5, 2023 4:00 PM Project Description The project consists of a 7,690 sf new 2-story steel framed building and sitework. 2021 Addenda None at this time.