Remove Building Resilience Remove Landscaping Remove Masonry
article thumbnail

Marshalls to cut 250 jobs as sales slump

Construction Enquirer

Building products manufacturer Marshalls is cutting 250 jobs and closing its factory in Carluke, Lanarkshire as the slowing housing market drags down sales. The job losses come on top of 150 redundancies at the end of last year.

article thumbnail

KDEM Emergency Operations & Training Center

The MCP Group

Bid Due Date | September 4, 2024 2:00 PM Project Description The project consists of an addition and renovation to the existing building.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Bid Due Date | June 7, 2024 2:00 PM Project Description The project consists of (4) metal buildings totaling 70,262 sf with associated sitework.

article thumbnail

Caliber Collision Billings, MT

The MCP Group

Bid Due Date | March 19, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. We are to include erection. 2021 Addenda None at this time.

article thumbnail

Caliber Collision North Little Rock, AR

The MCP Group

Bid Due Date | March 27, 2024 2:00 PM Project Description The project consists of a new 17,222 sf metal building and site work. The metal building material package has been purchased by the owner. Location North Little Rock, AR Plans AR Maumelle 3346-Building Plans (Rev3)-2024.03.06 We are to include erection.

article thumbnail

KDOT Gardner Subarea Complex

The MCP Group

Bid Due Date | January 18, 2024 2:00 PM Project Description The project consists of 3 new pre-engineered metal buildings totaling 20,800 sf and associated site work.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)