Remove Building Resilience Remove Landscaping Remove Millwork
article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

BL: Base Line, Building Line, Block. BLDG: Building. LA: Landscape Architect, Lightning Arrester. MWK: Millwork. RB: Rubber, Rubber Base, Resilient Base. RES: Resilient. RESIL: Resilient. BF: Board Foot, Back Face, Bottom Face, Both Faces, Boiler Feed. BG: Bag (e.g., of cement). BHD: Bulkhead.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

BL: Base Line, Building Line, Block. BLDG: Building. LA: Landscape Architect, Lightning Arrester. MWK: Millwork. RB: Rubber, Rubber Base, Resilient Base. RES: Resilient. RESIL: Resilient. BF: Board Foot, Back Face, Bottom Face, Both Faces, Boiler Feed. BG: Bag (e.g., of cement). BHD: Bulkhead.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

BL: Base Line, Building Line, Block. BLDG: Building. LA: Landscape Architect, Lightning Arrester. MWK: Millwork. RB: Rubber, Rubber Base, Resilient Base. RES: Resilient. RESIL: Resilient. BF: Board Foot, Back Face, Bottom Face, Both Faces, Boiler Feed. BG: Bag (e.g., of cement). BHD: Bulkhead.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. 00 41 53 Bid Form – Design/Build (Single-Prime Contract).

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

Standardized cost databases have been introduced based upon MasterFormat that enable construction owners, service providers, building product manufactures, and technology providers to improve cost visibility and also expand upon using historical and/or custom cost data. 00 41 53 Bid Form – Design/Build (Single-Prime Contract).