Remove Building Standards Remove Document Remove Handover
article thumbnail

Safety in Design Manuals: The Missing Piece in Project Handover

OmTrak

However, when it comes to project handover, it seems that the Safety in Design process is conspicuously absent. Evidence: Documentation of testing, results, and other relevant data. Strangely, this valuable information wasn’t part of the final handover process.

article thumbnail

OmTrak’s Wish List for the Construction Industry in 2025: Building a Better Tomorrow

OmTrak

Champion Validated Data What wed like to see : Building a transparent data environment where validated information drives decision-making. Enhance Project Governance for Commissioning and Handover What wed like to see : Establishing stricter governance frameworks to facilitate smooth transitions during commissioning and handover.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The 3 Core Pillars for Redefining Construction Handover 

Autodesk Construction Cloud

Handover is often thought of as happening only at the end of a project. But project handover really spans the lifecycle of a project as it involves multiple stakeholders, processes, and activities within that lifecycle. For that reason, it’s critical to get handover right from the very beginning.

article thumbnail

How to streamline the construction project handover process

LetsBuild

Every stage of the construction process is crucial to the project’s success – the handover phase is no different, but it comes with some unique challenges for everyone involved. Construction handover is like the finish line; everyone’s excited to get the build to the client, but it’s also the time when complacency can show its face.

article thumbnail

How to streamline the construction project handover process

LetsBuild

Every stage of the construction process is crucial to the project’s success – the handover phase is no different, but it comes with some unique challenges for everyone involved. Construction handover is like the finish line; everyone’s excited to get the build to the client, but it’s also the time when complacency can show its face.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The post Top 10 Construction Defects: Prevent These Costly Building Mistakes appeared first on UK Construction Blog. Effective prevention strategies include comprehensive pre-construction planning, robust quality assurance during building, clear communication between all stakeholders, and thorough documentation.

article thumbnail

Why Owners Need a Common Data Environment

Autodesk Construction Cloud

Beyond that, the cost of building facilities is increasing. But today, many owners lack visibility into the construction of their buildings. This issue is even more pronounced when owners are managing a portfolio of buildings, such as a factory or franchise. Acquiring capital is getting more expensive with rising interest rates.