Remove Carpentry Remove Concrete Pouring Remove HVAC System Installation
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Also, read: IS 516:1959 Most Important Point (Method of Tests For Strength of Concrete). After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done.

article thumbnail

51 Best Gifts for Construction Workers (DIY Ideas Too!)

Work Gearz

IDEAL FOR WORK AND PLAY--Ideal for woodworking and carpentry, metal and construction, cycling, shooting or other outdoor activities. They have in-built stereo system to listen to music while work or take calls as the in-built Bluetooth gets connected to any Bluetooth enabled device. Total Length of Strap : 47cm. Weight: 77g.