Remove Carpentry Remove Controls Manufacturing Remove Fire Protection Systems
article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft.

article thumbnail

Demystifying fire-retardant treated wood specifications

Construction Specifier

is experiencing a “wood revival” contributing to the complexity of fire-retardant-treated wood (FRTW) specifications. The building and fire codes require FRTW to be impregnated with chemicals. Two types of code-compliant, pressure-impregnated FRTW are manufactured: interior and exterior. By Mike Eckhoff, PhD. References.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 00 62 19 Infection Control Form.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 00 62 19 Infection Control Form.