Remove Carpentry Remove Controls Manufacturing Remove Waterproofing Systems
article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Location Pasadena, TX Plans 3 – Bid Set Architectural & Civil Plans Specifications On the plans. 6 – Geotech Report by ECS Southwest, LLP General Information 4 – Bid Set Project Manual MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 1 – Instruction to Bidders 7 – Geotech — Ft.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Location Fort Worth, TX Plans 4 – 230616_Echo_Fort Worth,TX – Thru REV 1 Specifications 5 – Echo Fort Worth, TX – SPECS 3 – 230616_Echo_Fort Worth,TX_REV 1 Narrative 6 – ECHO_Ft Worth, TX_COMcheck General Information 7 – Geotech — Ft.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Location Round Rock, TX Plans 3 – Echo Suites_Round Rock, TX – BID SET COMMENTS_01.26.2024 5 – Echo Suites Round Rock — Civil Plans — 1.15.24 6 – Geotech Revision for Shallow Footing Foundation — Wyndham Echo Hotel – Round Rock — 4.18.23 MCP Supplemental Conditions.2021

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 19 Infection Control Form. 01 33 26 Source Quality Control Reporting.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 19 Infection Control Form. 01 33 26 Source Quality Control Reporting.

article thumbnail

Reopening The Glass House with National Historic Trust

CCR Magazine

The interior had experienced deterioration of plaster, mold growth, and rusting mechanical systems. Fortuny is a world-famous luxury textile design and manufacturing company known for their exquisite and elegant fabrics since 1921. And, with failures of the flat roof and skylights, the building damage had been extensive.