Remove Carpentry Remove Masonry Remove Plumbing Systems
article thumbnail

How to Building Construction Process Step by Step

CivilJungle

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc. Over the plinth beam , masonry work has been started. Brick Masonry Work. Design Process.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Bid Due Date | July 18, 2024 2:00 PM Project Description The project consists of a new 35,000 sf metal building with associated sitework. 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Bid Due Date | March 9, 2023 2:00 PM Project Description Existing 5-story heavy timber frame and masonry building. Will be restored into a 50-unit apartment building.

article thumbnail

KHRC Office Remodel

The MCP Group

Bid Due Date | June 27, 2024 2:00 PM Project Description The project consists of a 27,000 sf 3-story renovation, with a new stair/elevator tower addition. 2021 Addenda None at this time.

article thumbnail

Liberal High School Library Renovation

The MCP Group

2021 Addenda None at this time.