Remove Carpentry Remove Painting/finishing Remove Steel Fabrication
article thumbnail

Roosevelt Lofts – San Angelo, TX

The MCP Group

Bid Due Date | February 22, 2024 2:00 PM Project Description 3-story Existing steel and masonry structure to be rehabilitated into 25 apartments and common area. Trades required include but are not limited to ACM Abatement, Select Demolition, Cast in place concrete, Concrete on decks, masonry restoration, CMU, Structural Steel, Misc.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Residence at Green Meadow – San Angelo, TX

The MCP Group

Surveying, earthwork, site utilities, landscaping, lot striping, termite treatment, concrete, stone veneer, masonry, misc.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Will require selective demolition, site, concrete, concrete infill, lightweight floor leveling, gypcrete, masonry restoration, masonry infills, structural steel, steel fabrications, rough carpentry, finish carpentry, single-ply roofing, building insulation, replacement windows, storefront glass systems, window restoration, mirrors, wood doors, frames, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)