article thumbnail

CDGB Bookstore – Independence, KS

The MCP Group

Bid Packages are available for the following; Demolition with ACM abatement, Masonry Restoration, Carpentry with window replacement, EPDM roofing system with (flashings, insulation, parapet caps, gutters and downspouts), Concrete, and Steel fabrications with installation. MCP Supplemental Conditions.2021

article thumbnail

11 Advantages Of Fabric Buildings

Construction Marketing

Since fabric buildings are tensile structures, the membrane can be pulled into a three-dimensional surface for developing shading, a roof, or a decorative component. Simply put, they’re a building made of all-steel frames and tarp covers or fabric material. Read on to learn about the advantages of fabric buildings.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Lee Lofts Phase 2 – Salina, KS

The MCP Group

Will require selective demolition, site, concrete, concrete infill, lightweight floor leveling, gypcrete, masonry restoration, masonry infills, structural steel, steel fabrications, rough carpentry, finish carpentry, single-ply roofing, building insulation, replacement windows, storefront glass systems, window restoration, mirrors, wood doors, frames, (..)