Remove Carpentry Remove Roofing Systems Remove Waterproofing Systems
article thumbnail

KHRC Office Remodel

The MCP Group

Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Wyndham Echo Round Rock, TX

The MCP Group

Bid Due Date | February 20, 2024 12:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

N.C. highway project news; concrete cobra effect article lead 2023 top 10

Construction Specifier

Many feature articles in the magazine also captivated readers ranging from how embodied carbon reduction creates a “cobra” effect, the science involved in mitigating mold and moisture, and the roof design’s essential considerations, to the future potential of insulated metal panels.

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)