Remove Carpentry Remove Wall Systems Remove Waterproofing Systems
article thumbnail

From mass masonry to veneer: The evolution of cavity wall design

Construction Specifier

The design of contemporary cavity wall assemblies is the result of a century of trial and error. During the transition from mass masonry walls to the “four barrier” (i.e. water, air, vapor, and thermal barrier) assemblies of today’s construction, the “early veneer walls” constructed between the mid- to late-20 th century emerged.

Masonry 64
article thumbnail

N.C. highway project news; concrete cobra effect article lead 2023 top 10

Construction Specifier

highway project news; concrete cobra effect article lead 2023 top 10 appeared first on Construction Specifier. highway project news; concrete cobra effect article lead 2023 top 10 appeared first on Construction Specifier.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Location Manhattan, Kansas Plans KSU Agronomy Research & Innovation Center Combined Plans Specifications KSU Agronomy Research & Innovation Center Combined Specifications General Information Bid Invitation KSU Agronomy Research & Innovation Center MCP Supplemental Conditions.2021

article thumbnail

Echo Suites – Pasadena, TX

The MCP Group

Bid Due Date | August 31, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4 story wood framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)

article thumbnail

Echo Suites – Fort Worth, TX

The MCP Group

Bid Due Date | July 19, 2023 2:00 PM Project Description New Construction of a 4-story wood-framed hotel that will include but not be limited to cast-in-place concrete, unit masonry, Manufactured masonry veneer, structural steel, metal fabrications, rough carpentry, wood trusses, finish carpentry, wood casework, FRP, waterproofing, building insulation, (..)