Remove Ceiling Systems Remove Electrical Systems Remove Millwork Remove Plumbing Systems
article thumbnail

Green Home Building and Sustainable Architecture: California's.

Natural Building

Using Earthbags as Ceiling Insulation. For renewable energy, the codes says, "Use on-site renewable energy sources such as solar, wind, geothermal, low-impact hydro, biomass and bio-gas for at least 1% of the electric power." Use pre-manufactured floor and roof systems to eliminate solid sawn lumber whenever possible.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 51 13 Temporary Electricity.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 51 13 Temporary Electricity.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIEE: American Institute of Electrical Engineers. ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. ELEC: Electrical. ELECT: Electrical. EWC: Electric Water Cooler.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

AIEE: American Institute of Electrical Engineers. ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. ELEC: Electrical. ELECT: Electrical. EWC: Electric Water Cooler.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

AIEE: American Institute of Electrical Engineers. ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. ELEC: Electrical. ELECT: Electrical. EWC: Electric Water Cooler.