Remove Ceiling Systems Remove Electrical Systems Remove Site Planning
article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

A heating recovery system uses the exhausted air to pre-heat and pre-cool incoming air before it’s delivered to the home. The all-electric homes use heat pumps for heating and cooling, as well as for hot water and dryers. The factory panelizes the ceilings, floors, and walls, then brings all the elements together to form the module.

article thumbnail

Top 10 Construction Defects: Prevent These Costly Building Mistakes

UK Construction Blog

The most dangerous defects include structural issues (foundation cracks, wall collapses), water infiltration, electrical/plumbing failures and HVAC system problems, which often remain hidden for years. Construction defects typically stem from poor workmanship, substandard materials, improper site preparation, or inadequate maintenance.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Housing, Industrialized: Designing for Off-Site

The Pro Builder

but one that needs to take place if home builders want to successfully transition from on-site stick-building to an off-site or factory-built model for the bulk of their structural needs. Beazer Homes partnered with Entekra , a panelized systems provider in Modesto, Calif.,

article thumbnail

The Desert Comfort Idea Home: a True Desert Oasis

The Pro Builder

The home’s single-level floor plan maintains a relatively compact footprint to preserve and protect its natural surroundings. The living area of the home’s open floor plan is anchored by a 6-foot-long direct-vent gas fireplace that recirculates heat back into the room, as needed, to reduce energy loads.

article thumbnail

PREMIER Design + Build breaks ground on NY Logistics Center

CCR Magazine

The 146,075-square-foot logistics center will feature 36-foot ceiling heights, 54-foot by 60-foot column spacing, 31 docks, two drive-in doors, and a 3,000-square-foot office space. acre site will include 16 parking spaces for tractor-trailers and 83 car parking spaces. The team plans to complete the project in Q4 2025.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. Rockfon ceiling panels also comply with all acoustic ceiling requirements for LEED v4.

article thumbnail

Energy Efficiency and Sustainability Lessons From The New American Home 2023

The Pro Builder

The New American Home (TNAH) 2023 not only showcases stunning design and views of the Las Vegas Valley but also serves as a model of high performance in home design, from the home's natural resource efficiencies and renewable energy systems to the healthy, comfortable indoor environment it provides for its owners.