Remove Ceiling Systems Remove Electrical Wiring Installation Remove Flooring Systems Remove HVAC System Installation
article thumbnail

Facilities Preventive Maintenance

Job Order Contracting

Installed model and features of each system. Provide instructions stating when the systems should be retested. Repair requirements must inform operators how to check out, troubleshoot, repair, and replace components of the system. Cleaning Recommendations-Provide environmentally preferable cleaning recommendations.

article thumbnail

Prepare for Home Renovation with These Insightful Tips

West Shore Construction

If you want to get the most out of your renovation, USA Today suggests considering the following improvements : Replace the tub Install natural stone kitchen countertops Replace siding and garage doors You Need a Place to Store Your Stuff Before contractors can start demolition, you need to clear out the room.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The Importance of As-Built Drawings in Construction Projects

iField Smart

These drawings, which are made once construction is over, provide precise measurements, placements, and descriptions of every element of the building, including the floors, ceilings, walls, doors, and windows. They demonstrate how the building’s power works and how each electrical part is related.

article thumbnail

The Importance of As-Built Drawings in Construction Projects

iField Smart

These drawings, which are made once construction is over, provide precise measurements, placements, and descriptions of every element of the building, including the floors, ceilings, walls, doors, and windows. They demonstrate how the building’s power works and how each electrical part is related.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. These drawings include all the juicy details, like how the floors are laid out, the building looks from different angles and even the little intricacies of the construction process.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances.