Remove Ceiling Systems Remove Electrical Wiring Installation Remove Heavy Lifting Transportation
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Have everything under control with a flexible hierarchical folder system that can be accessed from any device. From flat roofs to sloped roofs, there are various types to consider.

article thumbnail

19 Different Types of Slabs in Construction | What Is a Slab

CivilJungle

To supply plain ceiling surface giving preferable diffusion of sunlight. It diminishes floor -to-floor lofts when there’s no requirement for a deep false ceiling& hence building loftiness may be diminished. Utilized during a flat plate system, it’s impossible to possess a sizeable span.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

De-energize, lock out, and tag electrical circuits. Inspect electrical power panel. Check electrical connections and wiring for loose or overheated conditions. De-energize or discharge all hydraulic, electrical, mechanical, or thermal energy prior to beginning work. Door; Hydraulic, Electric or Pneumatic Operated.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Electrical Resistivity Investigations Information. 01 21 23 Installation Allowances.