A Case (Study) for Off-Site Construction in Home Building
The Pro Builder
APRIL 22, 2023
The design process also included pre-coordination with the mechanical, electrical, and plumbing (MEP) teams to mitigate any clashes of the utility infrastructure. The factory-built product was a complete structural package (called ONE Frame in Agorus’ nomenclature), including walls, floors, stairs, ceilings, and roofs.
Let's personalize your content