Remove Ceiling Systems Remove Events Remove Structural Systems
article thumbnail

From demolition to restoration: Detroit’s iconic train station reopens

Construction Specifier

The restored grand hall with its Guastavino tile ceiling. Work will continue on offices in the tower, as well as additional restaurants and retail spaces, public art displays, and community and event spaces. Initial renovation began in 2018.

article thumbnail

Energy-saving strategies: Ceiling panels with phase change material (PCM)

Construction Specifier

The recent innovation of integrating phase change material (PCM), a well-established technology, into ceiling panels has generated significant interest. Thermal mass As climate change continues to drive extreme weather events, there is an increasing emphasis on enhancing the resiliency of the built environment.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Seattle project demonstrates revitalization ideas for disused gas stations

Construction Specifier

Unfortunately, the old structure proved unsalvageable and too small for the envisioned events. Wood rafters are seen in the ceiling of the space. x 8 ft)—along the south gallery wall that opens to provide a strong connection to the park and serves as a cafe window during events.

article thumbnail

5 Roof Problems Common in Commercial Buildings in Katy, TX

CCR Magazine

Leaks can be caused by various factors, including damaged flashing, clogged drainage systems, or wear and tear on the shed’s membrane. When water penetrates the ceiling, it can cause significant damage to the building’s interior, including the growth of mold and mildew.

article thumbnail

Building True Service Partnerships

Civil + Structural Engineer

By Eric Donnay, Legacy Building Solutions Decades ago, acquiring a tension fabric structure didn’t require much of a process. Most manufacturers offered fabric structures with predetermined dimensions, and building users essentially chose the standard size offering from the menu that came the closest to fitting their needs.

article thumbnail

Wood-dominated ‘patchwork’ characterizes award-winning Colorado arts center

Construction Specifier

The facility also boasts an art gallery, visual arts studios, and two rehearsal rooms for community classes and events. The center’s blue-stained cedar exterior cladding sets it apart and has made it one of the most recognizable structures in town. The building spans 3,391 m 2 (35,600 sf) and is constructed using Type V-B methods.

article thumbnail

California’s unconventional office tower: Remarkable beyond its appearance

Construction Specifier

The structural concept of (W)rapper, built in a former industrial and manufacturing zone in Central Los Angeles and Culver City, originated in 1998 and was initially showcased by the project’s architect, Eric Owen Moss Architects (EOMA) in an exhibition at the Wexner Center in Columbus, Ohio. m (14 ft), 5.18 m (17 ft), and 7.32