Remove Ceiling Systems Remove Fire Protection System Installation Remove Millwork Remove Piping Installation
article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 01 73 19 Installation.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. 01 73 19 Installation.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. BD: Board, Blow Down (pipe). CIP: Cast Iron Pipe, Cast-in-Place. CISP: Cast Iron Soil/sewer Pipe. CLG: Ceiling. CMP: Corrugated Metal Pipe. CP: Cathodic Protection, Clothes Pole, Cesspool. ASB: Asbestos. ASPH: Asphalt. BAF: Baffle.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. BD: Board, Blow Down (pipe). CIP: Cast Iron Pipe, Cast-in-Place. CISP: Cast Iron Soil/sewer Pipe. CLG: Ceiling. CMP: Corrugated Metal Pipe. CP: Cathodic Protection, Clothes Pole, Cesspool. ASB: Asbestos. ASPH: Asphalt. BAF: Baffle.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. BD: Board, Blow Down (pipe). CIP: Cast Iron Pipe, Cast-in-Place. CISP: Cast Iron Soil/sewer Pipe. CLG: Ceiling. CMP: Corrugated Metal Pipe. CP: Cathodic Protection, Clothes Pole, Cesspool. ASB: Asbestos. ASPH: Asphalt. BAF: Baffle.