Remove Ceiling Systems Remove Fire Protection System Installation Remove Piping Installation
article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

New Technical Document Details Proper Steps for Use IRVING, Texas – A new technical document that addresses techniques for the safe and proper use of spray polyurethane foam insulation on and around plastic pressure pipe materials has been published by the Plastics Pipe Institute, Inc. layer) thickness installed.

article thumbnail

Transform Your Garage: Essential Upgrades for DIY Vehicle Maintenance

UK Construction Blog

Installing bright LED lights (3000-5000 lumens) eliminates shadows under vehicles and in engine compartments. An upgraded electrical system supports your maintenance activities effectively. An upgraded electrical system supports your maintenance activities effectively.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Plumbing Challenges in High-Rise Construction: A Plumber’s View

CCR Magazine

However, behind the scenes, theres a network of intricate plumbing systems that keep everything running smoothly. Plumbers often address this issue by installing booster pumps and pressure-regulating valves. These systems are designed to ensure consistent water pressure, regardless of the floor or the time of day.

article thumbnail

Why fire sprinklers belong above suspended drop-out ceilings

Construction Specifier

Ten reasons to stop poking holes in ceilings. Drop-out ceilings provide an alternative to ‘poke-through’ sprinkler installations and avoid the need to install drops from sprinkler mains so sprinklers can penetrate the ceiling and discharge water into the room below. Install ceiling grid.

article thumbnail

IFS renovates two historic buildings into mixed-use lofts

CCR Magazine

IFS provided design/build HVAC, fire protection and plumbing services as part of the $9.6 Image Courtesy of Advantes Group IFS also provided design/build HVAC, fire protection and plumbing services as part of the $14 million Greeley Lofts renovation. million renovation of the former Hoffman Produce Building on N.

article thumbnail

FIREFLYTM APOLLO LITE SPECIFIED FOR ROYAL STOKE REFURBISHMENT

Specification Product Update

A leading passive fire protection contractor has been involved in the installation of fully compatible products from the range of TBA FIREFLY TM for the creation of half hour fire barriers within ceiling voids to a major general hospital undergoing extensive refurbishment work in the north of England.

article thumbnail

Safe From the Start

Autodesk Construction Cloud

Prefabricated plenums can be installed on-site in less than a week, reducing onsite labor by 50% and eliminating the need to have people working at high heights over a sustained period. Today, you can pre-assemble large portions of the piping, duct, and conduit at floor level and then place it into larger, multi-discipline sections overhead.