article thumbnail

TCF Industrial Building #1

The MCP Group

Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

PPI and SPFA recommend that when there are plastic pipes and fittings in a wall, ceiling, or floor cavity, the SPF installer should apply one layer of foam until it touches the pipe but does not encase the pipe. Pipe and fitting materials include CPVC, PEX, PEX/AL/PEX, PE-RT, PP-R, PP-RCT, PSU, PPS, PPSU, and PVDF.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

The work includes site & building demolition, earthwork, rammed aggregate piers, termite control, site concrete, striping, site utilities, landscaping, cast-in-place concrete, unit masonry, stone, metal fabrications, finish carpentry/architectural woodwork, waterproofing, thermal insulation, joint sealants, doors/frames/hardware, overhead doors, (..)

article thumbnail

DO YOU FIRESTOP BOTTOM OF WALL

Halpert Life Safety

When you have a fire rated wall, let’s say it’s a gypsum wall, and it comes under a concrete deck, we all know the building code requires us to firestop that. it says joints installed in or between fire-resistance rated walls, floors or floor/ceiling assemblies…shall be protected by an approved fire-resistant-joint system….

article thumbnail

KHRC Office Remodel

The MCP Group

Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021 2021 Addenda None at this time.

article thumbnail

Fire-Rated Systems in Light-Frame Wood Construction

BDC Network

Fire-Rated Systems in Light-Frame Wood Construction 1 kcichowicz Thu, 07/20/2023 - 09:38 Multifamily Housing Find guidance on designing and building some of the most cost-effective, code-compliant fire-rated construction systems. Designing buildings that provide good fire protection, cost-effectively, can be challenging.