Remove Ceiling Systems Remove Fire Protection Systems Remove Flooring Systems Remove Roofing Systems
article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

Protecting lives and our most important heritage

Specification Product Update

Advances in fire resistant glazing have enabled modern performance expectations to be applied to architecturally sensitive and listed buildings as a variety of Promat SYSTEMGLAS® projects demonstrate. It was used to meet demanding passive fire protection objectives as part of a major project to upgrade the historic Victorian Market hall.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Fire-Rated Systems in Light-Frame Wood Construction

BDC Network

Fire-Rated Systems in Light-Frame Wood Construction 1 kcichowicz Thu, 07/20/2023 - 09:38 Multifamily Housing Find guidance on designing and building some of the most cost-effective, code-compliant fire-rated construction systems. Designing buildings that provide good fire protection, cost-effectively, can be challenging.

article thumbnail

Why fire sprinklers belong above suspended drop-out ceilings

Construction Specifier

Ten reasons to stop poking holes in ceilings. Drop-out ceilings provide an alternative to ‘poke-through’ sprinkler installations and avoid the need to install drops from sprinkler mains so sprinklers can penetrate the ceiling and discharge water into the room below. Install ceiling grid. Install ceiling panels.

article thumbnail

KHRC Office Remodel

The MCP Group

The work includes selective demolition, earthwork, site concrete, cast-in-place concrete, unit masonry, cast stone, structural steel, finish carpentry/architectural woodwork, waterproofing, air barrier, TPO roofing, joint sealants, doors/frames/hardware, aluminum storefront, automatic operators, gypsum board assemblies, tile, acoustical ceilings, resilient (..)

article thumbnail

FHSU Forsyth Library Renovation

The MCP Group

Location Hays, Kansas Plans FHSU Forsyth Library Renovation Combined Plans Specifications FHSU Forsyth Library Renovation Combined Specifications General Information Bid Invitation FHSU Forsyth Library Renovation MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post FHSU Forsyth Library Renovation appeared first on MCP GROUP.

article thumbnail

Seward County CC CDL Truck Driving School

The MCP Group

Location Liberal, Kansas Plans 22-051 SCCC CDL Truck Driving School – Bid Set Specifications 22-051 SCCC Specifications General Information Bid Invitation Seward CCC CDL Truck Driving School MCP Supplemental Conditions.2021 2021 Addenda None at this time.