Remove Ceiling Systems Remove Fire Protection Systems Remove Millwork
article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

We kept working at it and I think it came together very well.” The entry, set back from the garages and a casita that flank it, is further protected by a pair of prow-like roof shapes that add distinction and weight to the otherwise all-glass façade. The New American Home 2024 is no exception.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. Requirements. 00 31 46 Permits.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Existing Thermal and Moisture Protection Information. Requirements. 00 31 46 Permits.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FBRK: Fire Brick.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FBRK: Fire Brick.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CP: Cathodic Protection, Clothes Pole, Cesspool. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. FA: Fire Alarm, Fresh Air. FACP: Fire Alarm Control Panel. FBRK: Fire Brick.