article thumbnail

Efficient Heating & Cooling for Your Business with Mini Splits

Wolgast Corporation

When it comes to heating and cooling in small commercial building additions, remodels, or IT/server rooms, traditional central HVAC systems often fall short. Thats where mini split heating and cooling systems offer a smart, flexible solution. Units can be mounted to a wall, sat on the floor like a radiator, or recessed in the ceiling.

article thumbnail

Equans wins £72m West London estate recladding job

Construction Enquirer

Of the £72m investment, £36m will be spent on works to bring building services and finishes up to a modern standard, including the installation of sprinkler systems, upgraded mechanical, engineering, and public health systems, and completely refitted homes. The Paragon Estate was developed by Berkeley First, part of Berkeley Group.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Prefab, Modular Homebuilder Touts Energy and Cost Benefits

The Pro Builder

A heating recovery system uses the exhausted air to pre-heat and pre-cool incoming air before it’s delivered to the home. The factory panelizes the ceilings, floors, and walls, then brings all the elements together to form the module.

article thumbnail

Historic landmark’s renovation nears completion

Construction Specifier

Structural and system improvementsRenovated ceilings and flooring, a state-of-the-art fire suppression system, upgraded HVAC systems, and general restoration and improvements. All-new exhibitsCompelling galleries that delve into the stories of Dred and Harriet Scott, African American life in St.

article thumbnail

A Case (Study) for Off-Site Construction in Home Building

The Pro Builder

Rather, it employed an off-site construction method that built all of the wall panels, floor panels, and roof trusses in a nearby factory and assembled them on site in fewer than three days. Agorus' framing package for Daybreak included premade floor systems, each panel specifically engineered for its application in the system.

article thumbnail

Transform Your Garage: 10 Simple DIY Upgrades for a More Functional Home Space

UK Construction Blog

For example, a workshop requires durable flooring and ample workbench space, while a gym needs proper ventilation and impact-resistant flooring. Create a detailed floor plan with these measurements to help visualise potential layouts and identify space constraints. Carry out vertical storage solutions to maximise floor space.

article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. Innovative Solutions Driving Sustainable Success The $8.1M