Remove Ceiling Systems Remove Flooring Systems Remove Millwork Remove Wall Systems
article thumbnail

Remodel Your Commercial Office to Be More Modern

Wolgast Corporation

When I did an online image search for “modern office design”, I saw neutral color schemes of black, grey, white, or brown with a pop of accent color, minimalism, ergonomic furniture, biophilic décor, textured walls, glass dividers, natural light, and acoustic ceiling systems.

article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

The second floor features a 6,700-square foot yard in the back of the building, which is one of several outdoor tenant amenities. The 11th and 12th floors house multiple amenities, most of which are designed to take advantage of the breathtaking Manhattan views that are available from these floors.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

“I knew the view from the back of the lot would be great but also a little off-center to the right,” Coletti says, “so I put the kitchen in the left back corner of the floor plan to capture the best view.” The rest of the 7,800-square-foot, single-level floor plan flowed fairly easily from there, he says.

article thumbnail

Green Home Building and Sustainable Architecture: California's.

Natural Building

Using Earthbags as Ceiling Insulation. Each building shall further reduce the generation of wastewater by one of the following methods: The installation of water-conserving fixtures (water closets, urinals) or utilizing non-potable water systems (captured rainwater, graywater, and municipally treated wastewater (recycled water)."

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Asbestos Floor Tile and Mastic Abatement. 03 81 16 Track Mounted Concrete Wall Sawing.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. Asbestos Floor Tile and Mastic Abatement. 03 81 16 Track Mounted Concrete Wall Sawing.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ACFL: Access Floor. AF: Above the Floor. AFF: Above Finished Floor. ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. A: Area, Ampere; Acre; Alcove; Compressed Air Line.