article thumbnail

Adair County Awarded Preserve Missouri 2024 Project of the Year Project with Veregy

Civil + Structural Engineer

renovation project integrated energy-efficient systems into the 126-year-old courthouse structure, reducing energy consumption while maintaining the building’s historical integrity. Innovative Solutions Driving Sustainable Success The $8.1M

article thumbnail

Robust Facilities Sustainment Solution

Job Order Contracting

to name a few. #2. to name a few. #2. to name a few. #2. Implement a robust physical asset facilities maintenance process integrating scheduled, unscheduled repairs, and preventive maintenance tasks. #3.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

TCF Industrial Building #1

The MCP Group

Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

PPI and SPFA recommend that when there are plastic pipes and fittings in a wall, ceiling, or floor cavity, the SPF installer should apply one layer of foam until it touches the pipe but does not encase the pipe. Pipe and fitting materials include CPVC, PEX, PEX/AL/PEX, PE-RT, PP-R, PP-RCT, PSU, PPS, PPSU, and PVDF.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

The work includes site & building demolition, earthwork, rammed aggregate piers, termite control, site concrete, striping, site utilities, landscaping, cast-in-place concrete, unit masonry, stone, metal fabrications, finish carpentry/architectural woodwork, waterproofing, thermal insulation, joint sealants, doors/frames/hardware, overhead doors, (..)

article thumbnail

KHRC Office Remodel

The MCP Group

Location Topeka, Kansas Plans KHRC Office Remodel Combined Plans Specifications _23024-KHRC-INSTRUCTIONS TO BIDDERS _23024-KHRC-PROJECT MANUAL-06-07-2024 General Information Bid Invitation KHRC Office Remodel MCP Supplemental Conditions.2021 2021 Addenda None at this time.