Remove Ceiling Systems Remove Flooring Systems Remove Stonework
article thumbnail

Explore the Building Products That Make This Year's New American Home Another Standout

The Pro Builder

IBS #W2343 THE NEW AMERICAN HOME 2024 GOLD SPONSORS Kohler / *StoneWorks / Wellborn Cabinet Ceiling-Suspended Kitchen Faucet by Kohler Designed to maximize functionality and make kitchen tasks easier, the Purist Suspend kitchen faucet from Kohler * mounts from the ceiling, remaining out of the way until needed.

article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

“I knew the view from the back of the lot would be great but also a little off-center to the right,” Coletti says, “so I put the kitchen in the left back corner of the floor plan to capture the best view.” The rest of the 7,800-square-foot, single-level floor plan flowed fairly easily from there, he says.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Protecting lives and our most important heritage

Specification Product Update

The goal was to ensure the window’s ornate stonework and glass would be effectively protected in the event of a fire, balancing aesthetics with the need to ensure safety for town hall users, as well as to protect the culturally important building itself.

article thumbnail

15 Difference Between Plastering And Pointing | What Is Plastering | What Is Pointing

CivilJungle

Therefore it provides a suitable foundation or floor for surface decoration by adding whitewashing, sweeping, painting , and distempering. Its first coating offers the means to have a level floor. Used whenever artistic elegance is desired more often than not in the context of stonework. In order to mask the faulty workmanship.

article thumbnail

Green Home Building and Sustainable Architecture: An Alternative.

Natural Building

The passive solar aspect has been most rewarding, in that the average floor temperature during the winter has remained at 65 degrees F. First we inspected the yoga studio, a lovely, invitingly open space with floating bamboo floors and vaulted ceiling. This is another hand-made labor of love, with Keith doing most of the work.

article thumbnail

Find About the Latest News on Steel Used to Build the UK Wedgetail Facility, the Dispute Over UK Parliament’s £22bn Renovations, Innocrete3d Launches UK 3dcp, and a Timber in Construction Roadmap Should Start With Education

UK Construction Blog

Along with steel, the British government obtained 7,000-square-metre (75,000-square-foot) cladding for the E-7 maintenance and mission systems training buildings. McLaughlin & Harvey reported that the 100-million-pound ($124 million) mission systems training facility is being built next to Lossiemouth’s P-8A Poseidon hangar.