Remove Ceiling Systems Remove Flooring Systems Remove Waterproofing Systems
article thumbnail

TCF Industrial Building #1

The MCP Group

Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.

article thumbnail

ESU Nursing & Student Wellness Center

The MCP Group

Location Emporia, Kansas Plans ESU Nursing & Student Wellness Center Combined Plans Specifications 014518 Specification Vol 1 014518 Specification Vol 2 General Information Bid Invitation ESU Nursing & Student Wellness Center MCP Supplemental Conditions.2021

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

KSU Agronomy Research & Innovation Center

The MCP Group

Location Manhattan, Kansas Plans KSU Agronomy Research & Innovation Center Combined Plans Specifications KSU Agronomy Research & Innovation Center Combined Specifications General Information Bid Invitation KSU Agronomy Research & Innovation Center MCP Supplemental Conditions.2021

article thumbnail

KHRC Office Remodel

The MCP Group

The work includes selective demolition, earthwork, site concrete, cast-in-place concrete, unit masonry, cast stone, structural steel, finish carpentry/architectural woodwork, waterproofing, air barrier, TPO roofing, joint sealants, doors/frames/hardware, aluminum storefront, automatic operators, gypsum board assemblies, tile, acoustical ceilings, resilient (..)

article thumbnail

Transforming Your Basement Bathroom

CCR Magazine

Key considerations such as waterproofing and moisture control are critical due to Ottawa’s climate. Additionally, effective lighting and ventilation systems are essential to maintain air quality and prevent moisture-related issues. Use waterproof materials such as vinyl or ceramic tile for flooring and walls.

article thumbnail

NYU’s new visually striking complex embraces ambitious climate goals

Construction Specifier

As part of NYU’s plans for carbon neutrality by 2040, the team incorporated several energy efficient strategies and systems: Expanding the co-generation (CoGen) plant, NYU’s natural-gas-fueled power plant. In addition to an efficient filtration system, the John A. Paulson Center are constructed with an appropriate structural system.

article thumbnail

KSU Animal Science Arena

The MCP Group

The work includes site demolition, earthwork, termite control, site concrete, fencing, landscaping, site utilities, cast-in-place concrete, concrete floor finishes, masonry, stone, structural steel, decorative metal, heavy timber framing, architectural woodwork, waterproofing, air barriers, foamed-in-place insulation, applied fireproofing, joint sealants, (..)