Remove Ceiling Systems Remove Heavy Equipment Manufacturing Remove HVAC System Installation
article thumbnail

8 ways to cool a factory

BDC Network

Sergio Sádaba, Principal Industrial Facilities Designers Lists HVAC Mechanical Systems For most industrial factories, it’s process over people. The US manufacturing sector is booming. Manufacturing has one of the highest costs to hire, estimated at $5,100 by RecruiterBox. Manufacturing plants are often extremely hot.

article thumbnail

Tuning in on sound: Reducing noise in the workplace

Construction Specifier

Conversations or activity of other occupants, the whirl and beeps of computers and electronic equipment, and the hum of HVAC and mechanical systems all create a cacophony of unwanted sound that is hard to ignore. This goal includes conditions that support collaboration or focused independent activities.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Have everything under control with a flexible hierarchical folder system that can be accessed from any device. Well, it sets the stage for success.

article thumbnail

Material health: Metal fabric in healthcare design

Construction Specifier

Anyone who has spent time in an emergency room can attest to the number of gurneys, carts, and equipment being wheeled around and banged against walls. 2 Metal mesh panels lined with acoustic fleece manage interior noise transfer when applied as ceiling panels, partitions, and interior wall cladding.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Check the Attic and Ceilings : If the damage has happened in the outside portion of the roof , then you need to check the attic and ceiling for signs of water spots. Also Read: Types of Roof Tiles | Tile Roof Replacement | Tile Installation Cost | Roofing Tile Price | Ceramic Tile Price Per Square Foot | Tile Installation Factors.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid level and pressures/ change fluid per manufactures recommendations. Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. All fall protection equipment is required by OSHA to be checked prior to each use. Tool Group A.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.