Remove Ceiling Systems Remove Heavy Equipment Manufacturing Remove Piping Installation
article thumbnail

Transform Your Garage: Essential Upgrades for DIY Vehicle Maintenance

UK Construction Blog

From proper lighting and storage solutions to specialised equipment and flooring options, thoughtful garage improvements create an environment where vehicle care becomes accessible and efficient. Installing bright LED lights (3000-5000 lumens) eliminates shadows under vehicles and in engine compartments.

article thumbnail

Safe From the Start

Autodesk Construction Cloud

And rather than regularly regrading temporary roadways, ring roads are a way to accommodate heavy traffic from the start and make the delivery and handling of materials work smoothly on a consistent and ongoing basis. Previously, this work would be built on lifts, one conduit or pipe at a time.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Chicago LiUNA Center: Echelon’s Trendstone Plus® Showcase

CCR Magazine

Hands-on training courses include equipment operation, demolition, paving, sewer maintenance, scaffolding assembly and piping installation. Plans for the LiUNA expansion included classrooms, high ceiling equipment and vehicle training bays, an enhanced piping shop, an auditorium and a cafeteria.

Masonry 59
article thumbnail

Complete Construction Terminology Cheat Sheet: US and AU Specific

Buildern

These guidelines cover everything from how structures are designed to the electrical systems, plumbing, fire safety measures, and even accessibility. Have everything under control with a flexible hierarchical folder system that can be accessed from any device. Well, it sets the stage for success.

article thumbnail

Roof Storm Damage Checklist | What to Do After a Storm on Roof | Types of Roof Storm Damage | Roof Storm Damage Checklist

CivilJungle

Check the Attic and Ceilings : If the damage has happened in the outside portion of the roof , then you need to check the attic and ceiling for signs of water spots. Also Read: Types of Roof Tiles | Tile Roof Replacement | Tile Installation Cost | Roofing Tile Price | Ceramic Tile Price Per Square Foot | Tile Installation Factors.

article thumbnail

Facilities Maintenance Checklist and Procedures

Job Order Contracting

Check hydraulic unit fluid level and pressures/ change fluid per manufactures recommendations. Check hydraulic unit fluid connections, pump, piping and hoses for damage and leaks. Recommended Tools, Materials, and Equipment: 1. This standard is not intended to address all fall protection related equipment. Tool Group A.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Process Equipment Subgroup: Divisions 40 – 49. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 00 62 89 Construction Equipment Form.