Remove Ceiling Systems Remove HVAC System Installation Remove Millwork Remove Wall Systems
article thumbnail

5 Green Construction Practices that are becoming Standard Commercial Construction Procedures

Commercial Construction Blog

This includes standard erosion control measures like installing silt fence around the job site and putting filtering material in manhole covers to prevent sediment from entering storm sewers. This is due to standards set by municipalities, which now require contractors to recycle debris. Repurpose and Reuse.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 23 Installation Allowances. Prohibited Content Installer Certification.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 01 21 23 Installation Allowances. Prohibited Content Installer Certification.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HVAC: Heating, Ventilating & Air Conditioning. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit.

article thumbnail

Construction Abbreviations – A Decent List

Building Information Management

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HVAC: Heating, Ventilating & Air Conditioning. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit.

article thumbnail

List of Common Construction Abbreviations

Job Order Contracting

ASC: Above Suspended Ceiling. ATC: Acoustical Tile Ceiling. CLG: Ceiling. CTSC: Communications Systems Terminal Cabinet. EIFS: Exterior Insulation and Finish System. HVAC: Heating, Ventilating & Air Conditioning. HW: Hot Water, Heavy Wall. HWC: Hot Water Circulating, Heavy Wall Conduit.