Remove Ceiling Systems Remove Lifts Remove Plumbing Systems
article thumbnail

Robust Facilities Sustainment Solution

Job Order Contracting

to name a few. #2. to name a few. #2. to name a few. #2. Implement a robust physical asset facilities maintenance process integrating scheduled, unscheduled repairs, and preventive maintenance tasks. #3.

article thumbnail

APPLYING SPRAY FOAM INSULATION ON AND AROUND PLASTIC PIPES

Civil + Structural Engineer

PPI and SPFA recommend that when there are plastic pipes and fittings in a wall, ceiling, or floor cavity, the SPF installer should apply one layer of foam until it touches the pipe but does not encase the pipe. In certain instances, pipes and fittings are installed inside areas that must be insulated, such as within a ceiling or wall cavity.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

Alexandria City HS Redevelopment Features Rockfon Ceilings

CCR Magazine

The architectural team specified Rockfon acoustic stone wool ceiling systems to support the new high schools multiple performance requirements and to create a modern appearance aligned with 21st century educational facilities. Rockfon ceiling panels also comply with all acoustic ceiling requirements for LEED v4.

article thumbnail

Building Cost Models – Uniformat II

Building Information Management

Building cost models are based upon major buildings systems as defined by the Uniformat II classification system. Building and/or system models are experience-based and useful for conceptual cost estimating and/or capital renewal and/or life-cycle capital planning. C3030 Ceiling Finishes. D1010 Elevators & Lifts.

article thumbnail

Building Cost Models – Uniformat II

Building Information Management

Building cost models are based upon major buildings systems as defined by the Uniformat II classification system. Building and/or system models are experience-based and useful for conceptual cost estimating and/or capital renewal and/or life-cycle capital planning. C3030 Ceiling Finishes. D1010 Elevators & Lifts.

article thumbnail

Safe From the Start

Autodesk Construction Cloud

Prefabricating much of a data center’s MEP (mechanical, electrical, and plumbing) infrastructure has been another huge win. Previously, this work would be built on lifts, one conduit or pipe at a time. Integrated color eliminates the need for painters on lifts, working above other crews. Integrated color also lasts a lifetime.

article thumbnail

Great Bend Readiness Center Addition

The MCP Group

2021 Addenda ADD 1 ADD 2 plus attachments The post Great Bend Readiness Center Addition appeared first on MCP GROUP.