Remove Ceiling Systems Remove Millwork Remove Zoning
article thumbnail

The New American Home 2024: Modern Features, Timeless Comfort

The Pro Builder

The rear elevation optimizes the home’s view of the Las Vegas Valley and the Strip with floor-to-ceiling telescoping glass doors that pocket into adjacent walls for seamless indoor-outdoor flow. Continuing the flooring and ceiling materials from indoors to outside further strengthens the indoor/outdoor connection.

article thumbnail

The Bronx Vibe, a New, 155-residence, Luxury Rental Development

CCR Magazine

zoning and permitting consultant CORE Consultants; MEP engineer Ventrop Engineers; and structural engineer McNamara Salvia. The chic and functional coworking lounge offers multiple seating zones, table and counter work areas and a prep kitchen. It is also entirely ADA compliant.

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 04 42 26 Grid-System-Supported Stone Cladding. 06 22 00 Millwork. Requirements.

article thumbnail

A Primer on MasterFormat & Improving Construction Project Collaboration

Building Information Management

The MasterFormat numbering system and titles provide a common, transparent manner to readily communicate construction item, tasks, and associated information. Divisions are the top Level (Level 1) in the hierarchy of the classification system. 04 42 26 Grid-System-Supported Stone Cladding. 06 22 00 Millwork. Requirements.