Remove Ceiling Systems Remove Painting/finishing Remove Plumbing Systems
article thumbnail

Robust Facilities Sustainment Solution

Job Order Contracting

to name a few. #2. to name a few. #2. to name a few. #2. Implement a robust physical asset facilities maintenance process integrating scheduled, unscheduled repairs, and preventive maintenance tasks. #3.

article thumbnail

Reaching a new level of sophistication with panelized construction

Construction Specifier

Construction of wall, floor, and roof systems offsite has multiple advantages, including compressing the project schedules, reducing site labor and waste, improving consistency and quality control, and increasing safety for workers. Just about any finish that can be applied to a floor or wall surface can be used on the panels.

article thumbnail

Architect weaves island essence into renovated Washington arts center

Construction Specifier

The renovated auditorium features improved seating, sightlines, and accessibility, along with enhanced finishes, energy-efficient lighting, and revitalized support spaces and building systems. The roof and ceiling plane echoes the region’s architectural vernacular and is expressive of the building program.

article thumbnail

Housing, Industrialized: Designing for Off-Site

The Pro Builder

Beazer Homes partnered with Entekra , a panelized systems provider in Modesto, Calif., Everything has to be in the same place every time,” says Ray Ferrarini, VP of operations for Beazer Homes, and not just the framing components but also the plumbing, electrical, and anything else inside the slab. Photo: Jeff A. “You

article thumbnail

Structural engineering solutions for office-to-residential conversion

BDC Network

Getting to the structure is not always easy and may mean removing existing ceilings and wall finishes long before the general demolition begins. Issue 3: Structural design for mechanical, electrical, and plumbing Coordinate with the structural engineering team as you plan unit layouts, plumbing, and HVAC.

article thumbnail

Failures: Understanding plaster ceilings in older buildings

Construction Specifier

Failure of plaster ceiling due to additional weight of attached metal and wood ceilings. Plaster ceilings are often found during renovations and assessments of older buildings. During the 18 th to the mid-20 th centuries, lath and plaster construction was widely used to finish interior walls and ceilings.

article thumbnail

TCF Industrial Building #1

The MCP Group

Location Topeka, Kansas Plans TCF Industrial Building #1 Combined Plans Specifications TCF Industrial Building #1 Combined Specifications General Information Bid Invitation TCF Industrial Building #1 MCP Supplemental Conditions.2021 2021 Addenda ADD 1 The post TCF Industrial Building #1 appeared first on MCP GROUP.